General Building

Bathroom fitting

A full fit-out handled by one company, including the parts behind the wall that decide whether the room lasts.

Bathroom fitting, from strip-out to the final tile

Many fitters rush to the tiling. We start with what you cannot see. Walls, floors and drainage are put right first, so the finish stays perfect for years. Then we create a bathroom built for you, with high-quality tiling, premium fittings and thoughtful details. The making good is included in your quote, and the finished room carries our 25-year workmanship guarantee.

What the work covers

  • Strip out and disposal
  • First fix plumbing and electrical coordination
  • Floor strengthening and substrate preparation
  • Tanking to wet areas and shower enclosures
  • Wall and floor tiling
  • Extraction and ventilation
  • Second fix, sealing and final finishing
A bathroom stripped to the studwork, with new copper pipework run in and moisture-resistant board fixed to the lower wall
New pipework and studwork, boarded before any tile goes on

Damp in a bathroom is not always plumbing. Where it sits on an outside wall or under a flat roof, we check the fabric before assuming a leaking seal.

Recent work

Bathrooms we have fitted

Drag the handle to compare the room before and after, then scroll through the finished rooms.

The same room refitted with a walk-in shower, marble-effect wall panels, a heated towel rail and a wall-hung toilet
A dated bathroom with a panelled bath, white wall tiles and a radiator under the window
Before After

Bathroom refit

The finished bathroom with a freestanding bath, lit mirror, timber vanity unit and dark floor tiles
The bathroom stripped back to brick and joists, with new pipework running across the floor
Before After

Bathroom, strip-out to finish

Family bathroom Finished work · 6 photographs
En suite shower room Finished work · 4 photographs
Period-style bathroom Finished work · 4 photographs
Shower room Finished work · 3 photographs
Walk-in shower Finished work · 2 photographs
Shower room Finished work · 4 photographs

See all projects

Questions

Common questions

Around 2 weeks on average, depending on the size and scope of the project.

You can buy the fittings yourself from a bathroom retailer such as Wickes, or Daniel can help you choose and source them. Either way, measuring and design support are included in your quotation.

Usually. The deciding factor is where the soil pipe and waste can run, more than the water supply. We look at what is achievable at survey and price it as a fixed figure.

Request a survey

We look at the job before we price it

Someone comes out, looks at the work properly (getting on the roof where it is safe to do so) and photographs what they find. You get those photographs and a fixed, itemised quotation.

  1. 01 SurveyWe look at the job properly and photograph what is actually there.
  2. 02 QuoteA fixed, itemised figure with those photographs attached.
  3. 03 ScheduleA written start date, and one named contact throughout.
  4. 04 FinishSwept daily, signed off with you, guaranteed in writing.
25-year workmanship guarantee from ART Building & Interiors

Written workmanship guarantee issued on completion, with evidence of insurance on request.

Contact us Reply within 24 hours
Free quotation Fixed price Honest communication
So we can confirm we cover you.
Or call 07469 856075

We survey and photograph the job before we price it. If something does not need replacing, we will tell you.

Privacy policy